Wednesday, 28 July 2010
The Last Goat Cycle
Morning. Here is another goat run cycle. This one was the mummy goat. Mr Phil did these, the whole project was traditional 2D.
Tuesday, 27 July 2010
Mr Crumbles Desk
Monday, 26 July 2010
Mr Pauls letter
Here is Mr Pauls letter from Clarence House. This was a thank you note to him for doing the design for the bookmarks for schools tie in for the Prince's Rainforest Project. We did a load of films for the PRP you tube pages, which Paul was heavily involved in. Here is my favourite one which Mr Paul did himself.
Friday, 23 July 2010
Thursday, 22 July 2010
Wednesday, 21 July 2010
Rubbish T-Shirt
Tuesday, 20 July 2010
Disney Veg
Monday, 19 July 2010
Tweenies
Here is another Tweenies still. This was when Milo and Bella were having a race. The tree's used in this in Cg were modeled from the trees we did in stop motion for a short called The Village With the 3 Corners back in 1990. One of the trees has been wondering round the studio in all that time. So Mr Paul decided to use it again. Lucky Tree.
Friday, 16 July 2010
Robbie Prezzy
Here is a lovely thanks picture given to us from the director of Robbie the Reindeer thanking us for our work on the storyboards and the Vikings back story section (which you can see a still of the construction here). All made special by the googly eyes!
Thursday, 15 July 2010
Wednesday, 14 July 2010
More studio now with added peeps
Tuesday, 13 July 2010
Another Studio Photo
Monday, 12 July 2010
A Tweenies board
Hi, late post today as we have had trouble with our server.
Here is a bit of an old Tweenies storyboard. We did the boards before they were green screened so the people filming them would have an idea of how everything would work together. We usually composited the green screen and made the fantasy world in which they were in. It was either 2D traditional or CG.
Here is a bit of an old Tweenies storyboard. We did the boards before they were green screened so the people filming them would have an idea of how everything would work together. We usually composited the green screen and made the fantasy world in which they were in. It was either 2D traditional or CG.
Friday, 9 July 2010
Walk Cycle
Thursday, 8 July 2010
Last Cartoon
Here is the last one of these I have which were saved by Mr Paul. It's funny because you (mostly) always end up missing a project when its all finished. I personally miss working on Albie as it was one of the last completely 2D traditional projects we worked on. I miss my lightbox. Well, a little bit.
These were all drawn by Mr Phil. He doesn't remember doing them btw.
These were all drawn by Mr Phil. He doesn't remember doing them btw.
Tuesday, 6 July 2010
Stress Relief
This little drawing (that is not tea stained, it got wet when Mr Pauls room flooded) is one of the many tit bits of scribbles that appear when an animator is probably on his (or her) 11th hour straight animating highly detailed drawn animation and just occasionally it's fun to get some frustration out on a little cartoon. This was drawn by Mr Phil, I think this stemmed from having to do some intricate animation whilst a character is wearing an elaborate pirate hat.
Monday, 5 July 2010
Madonna Characters
Here are some rough character animation frames from the Madonna video 'Dear Jessie' we worked on at the end of the 80's for Animation City. This was her last 80's single in fact.
We did the love parade characters above and the charcoal section where we fly through some make believe land. And some of the fairy.
We did the love parade characters above and the charcoal section where we fly through some make believe land. And some of the fairy.
Friday, 2 July 2010
Another T-shirt
Thursday, 1 July 2010
A Dusty and Musty T-shirt
Subscribe to:
Posts (Atom)