Friday 2 November 2012

A List

 Here is a list of all the things needing to be designed and built for one 11 min episode of Pedro and Frankensheep. The items marked in green are already done and in a prop library from the 5 min episodes that the Brothers McLeod had done previously.
Oh and we had to do this (build into flash, colour and sometimes have animation in it) in about 2 weeks between 2 and a half people. While this was being done the storyboard was being drawn. It was a tight schedule, but we always do it. Good teams are essential... and a lot of organizing.

No comments:

Post a Comment